我自己并没有想出这个(它取自 Forester 的 blog post),但是我想我会把它添加到答案列表中,因为它是我第一次实现 ISO 8601 周数约定在 R 中见过。
毫无疑问,周数是一个非常模棱两可的话题,但我更喜欢 ISO 标准,而不是通过 format(..., "%U") 当前实施的周数,因为这似乎是大多数人都同意的,至少在德国(日历等) .).
我已将实际函数 def 放在底部,以便于首先关注输出。另外,我偶然发现了包ISOweek,也许值得一试。
方法比较
x.days <- c("Mon", "Tue", "Wed", "Thu", "Fri", "Sat", "Sun")
x.names <- sapply(1:length(posix), function(x) {
x.day <- as.POSIXlt(posix[x], tz="Europe/Berlin")$wday
if (x.day == 0) {
x.day <- 7
}
out <- x.days[x.day]
})
data.frame(
posix,
name=x.names,
week.r=weeknum,
week.iso=ISOweek(as.character(posix), tzone="Europe/Berlin")$weeknum
)
# Result
posix name week.r week.iso
1 2012-01-01 Sun 1 4480458
2 2012-01-02 Mon 1 1
3 2012-01-03 Tue 1 1
4 2012-01-04 Wed 1 1
5 2012-01-05 Thu 1 1
6 2012-01-06 Fri 1 1
7 2012-01-07 Sat 1 1
8 2012-01-08 Sun 2 1
9 2012-01-09 Mon 2 2
10 2012-01-10 Tue 2 2
11 2012-01-11 Wed 2 2
12 2012-01-12 Thu 2 2
13 2012-01-13 Fri 2 2
14 2012-01-14 Sat 2 2
15 2012-01-15 Sun 3 2
16 2012-01-16 Mon 3 3
17 2012-01-17 Tue 3 3
18 2012-01-18 Wed 3 3
19 2012-01-19 Thu 3 3
20 2012-01-20 Fri 3 3
21 2012-01-21 Sat 3 3
22 2012-01-22 Sun 4 3
23 2012-01-23 Mon 4 4
24 2012-01-24 Tue 4 4
25 2012-01-25 Wed 4 4
26 2012-01-26 Thu 4 4
27 2012-01-27 Fri 4 4
28 2012-01-28 Sat 4 4
29 2012-01-29 Sun 5 4
30 2012-01-30 Mon 5 5
31 2012-01-31 Tue 5 5
函数定义
它直接取自blog post,我刚刚更改了一些小东西。该功能仍然有点粗略(例如第一次约会的周数很远),但我发现这是一个不错的开始!
ISOweek <- function(
date,
format="%Y-%m-%d",
tzone="UTC",
return.val="weekofyear"
){
##converts dates into "dayofyear" or "weekofyear", the latter providing the ISO-8601 week
##date should be a vector of class Date or a vector of formatted character strings
##format refers to the date form used if a vector of
## character strings is supplied
##convert date to POSIXt format
if(class(date)[1]%in%c("Date","character")){
date=as.POSIXlt(date,format=format, tz=tzone)
}
# if(class(date)[1]!="POSIXt"){
if (!inherits(date, "POSIXt")) {
print("Date is of wrong format.")
break
}else if(class(date)[2]=="POSIXct"){
date=as.POSIXlt(date, tz=tzone)
}
print(date)
if(return.val=="dayofyear"){
##add 1 because POSIXt is base zero
return(date$yday+1)
}else if(return.val=="weekofyear"){
##Based on the ISO8601 weekdate system,
## Monday is the first day of the week
## W01 is the week with 4 Jan in it.
year=1900+date$year
jan4=strptime(paste(year,1,4,sep="-"),format="%Y-%m-%d")
wday=jan4$wday
wday[wday==0]=7 ##convert to base 1, where Monday == 1, Sunday==7
##calculate the date of the first week of the year
weekstart=jan4-(wday-1)*86400
weeknum=ceiling(as.numeric((difftime(date,weekstart,units="days")+0.1)/7))
#########################################################################
##calculate week for days of the year occuring in the next year's week 1.
#########################################################################
mday=date$mday
wday=date$wday
wday[wday==0]=7
year=ifelse(weeknum==53 & mday-wday>=28,year+1,year)
weeknum=ifelse(weeknum==53 & mday-wday>=28,1,weeknum)
################################################################
##calculate week for days of the year occuring prior to week 1.
################################################################
##first calculate the numbe of weeks in the previous year
year.shift=year-1
jan4.shift=strptime(paste(year.shift,1,4,sep="-"),format="%Y-%m-%d")
wday=jan4.shift$wday
wday[wday==0]=7 ##convert to base 1, where Monday == 1, Sunday==7
weekstart=jan4.shift-(wday-1)*86400
weeknum.shift=ceiling(as.numeric((difftime(date,weekstart)+0.1)/7))
##update year and week
year=ifelse(weeknum==0,year.shift,year)
weeknum=ifelse(weeknum==0,weeknum.shift,weeknum)
return(list("year"=year,"weeknum"=weeknum))
}else{
print("Unknown return.val")
break
}
}