【发布时间】:2022-01-18 21:14:08
【问题描述】:
我经常遇到这样的问题,即我有描述状态(在本例中为项目阶段)的确切变化的数据,我想记录这些数据。
这意味着我希望能够在过去的某个时间描述哪个项目处于哪个阶段。
让我们使用这个测试数据:
library(data.table)
library(lubridate)
df = structure(list(Project = c("A", "A", "B", "B", "B", "B", "C",
"C", "C", "D", "D"), Date = structure(c(18659, 18748, 18687,
18718, 18748, 18871, 18718, 18718, 18779, 18659, 18840), class = "Date"),
Phase = c("Init", "P2O", "Init", "P2O", "Build", "Doc", "Init",
"P2O", "Build", "Init", "P2O")), row.names = c(NA, -11L), class = c("data.table",
"data.frame"))
df[, Date:=ceiling_date(as.Date(Date, format="%d.%m.%Y"), "month")]
它们看起来像:
Project Date Phase
Project Date Phase
1: A 2021-03-01 Init
2: A 2021-06-01 P2O
3: B 2021-04-01 Init
4: B 2021-05-01 P2O
5: B 2021-06-01 Build
6: B 2021-10-01 Doc
7: C 2021-05-01 Init
8: C 2021-05-01 P2O
9: C 2021-07-01 Build
10: D 2021-03-01 Init
11: D 2021-09-01 P2O
现在我想创建一个表格,其中每个阶段都有一个列,每个日期有一个行。
我试过了:
> dcast(df, Date~Phase, fun=length)[order(Date)]
Date Build Doc Init P2O
1: 2021-03-01 0 0 2 0
2: 2021-04-01 0 0 1 0
3: 2021-05-01 0 0 1 2
4: 2021-06-01 1 0 0 1
5: 2021-07-01 1 0 0 0
6: 2021-09-01 0 0 0 1
7: 2021-10-01 0 1 0 0
但这是一个大错误。 让我们看看A项目。
Project Date Phase
1: A 2021-03-01 Init
2: A 2021-06-01 P2O
项目 A 于 2021 年 3 月 1 日进入“初始化”阶段,2021 年 6 月 1 日进入“P2O”阶段。在当前的逻辑中,这看起来像:
Date Build Doc Init P2O
1: 2021-03-01 0 0 1 0
4: 2021-06-01 0 0 0 1
但这是错误的。在 3 月和 6 月之间,该项目仍处于 Init 阶段,因此正确的应该是这样的:
Date Build Doc Init P2O
1: 2021-03-01 0 0 1 0
2: 2021-04-01 0 0 1 0
3: 2021-05-01 0 0 1 0
4: 2021-06-01 0 0 0 1
有人知道我该如何解决这个问题吗?
【问题讨论】:
标签: r data.table lubridate