timeDesign

You can use the timeDesign command to run Early Global Route, extraction, and timing analysis.
The timeDesign command generates detailed timing and DRV reports. For example,

Base Delay Reporting

report_timing

You can use the report_timing command to report timing paths. It is recommended to use the report_timing –
net parameter to produce a comprehensive report. For example,

reportDelayCalculation

You can use the reportDelayCalculation command to report the delay calculation information for a cell or net timing
arc. For example,
innovus > reportDelayCalculation -from seg3/u5/Y -to seg3/u6/A

相关文章:

  • 2022-12-23
  • 2022-12-23
  • 2021-12-19
  • 2022-12-23
  • 2021-11-27
  • 2022-12-23
  • 2022-12-23
  • 2022-12-23
猜你喜欢
  • 2022-01-25
  • 2021-10-17
  • 2021-09-20
  • 2021-07-30
  • 2021-07-08
  • 2022-12-23
  • 2022-12-23
相关资源
相似解决方案